Red-D-Arc worked very closely with the company to ensure their success, providing comprehensive training and on-site assistance. 7x submerged arc packages with LT7 tractors and DC600 power sources.

Red-D-Arc experts were on-hand to provide the right advice and the right equipment to address these challenges. The manufacturer also had questions on how to avoid ovality and transverse movement of the sub-assemblies. This would avoid the time consuming process of acquiring CAPEX approval to purchase such a large amount of equipment and would further increase the profitability of the project. While other suppliers where insistent that the customer purchase the equipment, Red-D-Arc determined that long term rental would be their best option. The experienced Red-D-Arc Weld Automation team was able to immediately address all of the customer’s challenges. Each of the tanks was to be 5 meters in diameter by 25 meters long, manufactured using 16 millimeter thick material at a weight of approximately 45 tonnes. The requirement was to manufacture 25 large tanks with a timeframe of only one year. It was awarded to them at the last minute and was not their primary area of expertise. An oilfield equipment and vessel manufacturer in the United Arab Emirates approached Red-D-Arc for assistance with a large project.